soil use are long-term priorities (№ 3 and № 5) Development Strategy of Kazakhstan until 2030 and are relevant today, with the introduction of more effective management subsoil of Kazakhstan. The degree of risk of the project is the lack of demand low. The risk of under-utilization of the design capacity of IIS USSUMS RK is also minimal.technical risks of the project include the mismatch created product and platform chosen objectives and functions of MOG, the inability to integrate an "e-government". Measures to manage these risks are:
Rigorous selection of the project team on the eligibility criteria. Educating technology project design work, tools;
The use of company standards for design work, standards development project;
The involvement of the project team of employees in state and local government public bodies.risks associated with the scale of the project include reducing the project's quality and consistency with the objectives and functions of the MOG. To reduce the risk of a detailed analysis of each stage of the work, the interaction of the participants, the organization works. And also apply An elaborated program quality, waste management project configuration, the special procedures of interaction between participants. br/>
Conclusion
Finally, a report on the practice, it should be noted that the practical training has helped me to understand the structure of the Ministry and its basic functions.summary, the Ministry of Economic Development and Trade of the Republic of Kazakhstan - the central executive body intersectoral and inter-regional coordination of the development guidelines of the state of social and economic policy, the mission of which is to develop a coherent and effective system of state planning, aimed at the achievement of strategic objectives and priority tasks of social and economic development and the development of trade.believe that to deal with such issues as:
В· organization and functioning of management review;
В· development and use of modern methods of governance and regulation in the functioning of MOG;
В· study of information and communication for the control system of the Ministry;
Was an intern at the Department of the oil industry, I have studied transfer pricing, tolling system, the strategic development plan for 2012 - 2015 year. There are many shortcomings in the work of the Ministry. p align="justify"> В· First, the work is not systematized in the Ministry, which is the main reason for the delay consideration of certain suspensive projects that require immediate attention. Also, workers have to spend the weekend (holiday) days at work, as it requires the authorities;
В· Second, there is a shortage of personnel. Because of the absence of the latter, this work is assigned to other employees, which requires allocation of more time to perform their duties;
В· Third, low wages. The current level of wages is not attractive to the youth of today, which is why there is a turnover, and the specialization of graduates is different from that required in the position that they occupied;
In general, one of the key problems mentioned MNG high staff turnover due to tight working conditions and lack of transparency of information.the report, I relied on the regulations and by-laws of the Ministry of Oil and Gas, I have been given details of the Strategic and Operational Plan of the Ministry., have practice for two and a half months, I tried to collect all the necessary material and do all the work that has been entrusted to me initially.
References
. Regulatory acts
.
. The strategic plan of the oil industry