0119,86 1609,98 2069,97 1379,98 689,9904 3219,955 - - - - - 3238,24 - 3238 , 24 - - - - - 40 478 - - - - - - - - - - - - 10255,77 7976,71 4558,12 5600,9344 17396,12 6212,5192 5101,746 2289,5128 1144,7568 4129,4878- 40478TOTAL22790,615158,8820239,7246954,48-105143,68precinct aggregate Mechanical fitter Electrical Cordless By the system power Tire Changers vulcanization Forging and for springs coppersmith welding tinsmith reinforcement Joinery Painting Upholstery- - - - - - - - - - - - -- - - - - - - - - - - - - - - - - 689,9904 689,9904 689,9904 689,9904 - - - - - - - - - 25905,92 12952,96 12952,96 1619 , 12 4857,36 4857,36 3238,24 4857,36 3238,24 8095,6 8095,6 8095,6 - 12952,96 3238,24- 7777,3 - - - - - 598,252 299,126 1196,5 1196,5- - - - 25905,92 20730,26 13642,95 2309,1104 5547,3504 5547,3504 3238,24 5455,612 3537,366 9292,1 9292,1 8095.6 - 12952.96 3238.24TOTAL- - 2759,96114957,5211067, 68128785,16Lots of self-care: electro technical Pipeline Repair and construction - - - - - - - - - - - - 7478,15 6580,77 4786 7478.15 6580.77 4786TOTAL --- - 18844,9218844,92TOTAL22790,615158,8822999, 6816191229912,6252773,76
2.6 Calculation of the number of production workers
For production workers include working areas and areas directly performing work and CR rolling stock. Foundation depends on the duration and the number of shifts working days a year. Annual Fund-time regular worker determines the actual time spent executing directly in the workplace.
2.4of the number of workers
Name areas and shopsAnnual volume of work on the zone or areaРТaccepted number РТФРNumber of full-time employeesTotalreassignmentratedadoptedZone M and CR: - DM Zone - Zone M - 1 - Zone D - 2 - ZonaD - 1 - Area M - 2 - CR zone (posts) 22790,6 15158,88 2508,48 23902,032 20239,72 46954,48 11 7 1 12 12 23 11 7 1 12 12 23 6 4 1 6 6 12 1780 1780 1780 1780 1780 1730 13 9 2 14 14 27 13 9 2 14 14 27TOTAL6666357979Industrial areas: - aggregate - Electrical Engineering - battery - By the system power - tire - vulcanising - coppersmith - welding - Forging and mechanical suspension - Mechanical fitter - carpenter - Reinforce-body -wallpaper - painter - sheet metal 25905,92 13642,95 6264,9 2309,1104 5547,3504 3238,24 3537,366 9292,1 5455,612 20730,26 - 8095.6 3238.24 12952.96 9292,1 12 7 3 1 3 2 2 3 квітня 10 - 4 2 6 4 12 7 3 1 3 2 2 4 3 10 - 4 2 6 4 6 3 1 1 1 1 1 2 2 5 2 1 3 2 1780 1780 1730 1730 1780 1730 1730 1730 1730 1780 1780 1780 1780 1760 1780 15 8 4 1 3 2 2 5 3 12 5 2 7 5 15 8 4 1 3 2 2 5 3 12 5 2 7 5TOTAL6262317373- repair and construction - steam piping - Electrical Engineering4786 6580,77 7478,152 3 42 3 41 840 1840 18403 4 43 4 4TOTAL991111TOTAL137137144144 of workers needed technologically determined by the formula:
of workers needed technologically determined by the formula:
Фм - annual fund temporary jobs or technologically necessary working in one shift, hour.
Annual Fund-time job or technologically necessary working hours for a six-day working week is:
Фм=(ДКГ-Дв-Дм) 7-Дпп 1, годину
Фм=(365-52-7) 7-56 1=2086 год
According to calculations, the annual fund-time one workstation will be Фм=2 086 hour.of the number of workers on the MC mix in the table 2.4.
2.7 Calculating the number of posts and lines maintenance and capital repair
Mode of operation zones maintenance and repair. Mode of operation zones maintenance depends on the mode rolling stock on the line.DM and M - 1, operated in time between replacement duration defined service areas of intragarage release schedule and return vehicles. Duration time between replacement for uniform release vehicles can be determined:
where ТН - duration of the cars on the line, hour;
То - Lunchtime driver, hour;
ТВ - duration producing cars on line, hour.
zones assigned to one shift. To assign a M - 2 in 1 shift. Daily posts of this mode assign repair in 1 shift. Production shops operate in one shift.production:
where Тоб - duration of the zone for this type of M within days,;
С - the number of shifts;
batch production lines used for M - 1and M - 2. Tact line is then determined by the formula:
where РЛ - the total number of technologically necessary working on the line M, person.number of workers on the line defined by the formula:
Рл=Хл РсрХл - number of posts on the line, adjustable for technological reasons, in accordance with the distribution of works of this kind of service; Рср - the average number of workers in the post.
Рл1=4 лютого=8 man
Рл2=4 лютого=8 manli...