ngs in the pillar, combine the previously mentioned risks and tighten bolts and screws.40installation of locksfrom above20,6screwdriverfree links loops into the position corresponding to the maximum opening angle of the door; push the door on the links and loops through the mounting socket hatches tighten bolts. Adjusting the door in the doorway: on the one hand if both doors were removed, then the adjustment is recommended to start with door; lock door lock in the open or remove a clamp; loosen 2-3 turns bolts top and bottom hinge to the door; the door is in the open position; adjustment is desirable to conduct reviews; at the bottom of the door opening to put two wooden lining 40x70 mm and 7 mm thick (nominal); gently close the door and adjust its position in the doorway.. ECONOMIC PART
4.1 Calculation of capital cost
Inlet qualification work provides design lift for body area. Main technical characteristics of the projected lift following: load, kN .................................... 160lifting height not less, mm 1600, m/s .................................................... 0,006capacity of the drive, no more .......................... 12 kWdimensions, mm:
one rack ................................................ 1220x1200x2760Coach ................................... 1010x910x1410, kg:
Support for buses .................................................. 80 .................................................................. 3313of the proposed lift buses will improve the quality of work in the body section, improve the usability of the work , to reduce the volume of work and mechanize the process of car repairs.investments for the manufacture of lift includes the cost of materials required for the manufacture of the lift installation, and workers 'wages, conducting manufacturing; energy costs, etc.above types of costs are summarized in Table 4.1.
Table 4.1expenditures for the manufacture of lift
namePrice per unit, sumNumberAmount, sumracks1251006 pcs750600shock absorber1000806 pcs600480mounting racks250206 pcs150120cylinder racks1203756 pcs722250grounds racks722256 pcs433350Boot rack722256 pcs433350platform rack385206 pcs231120electric wire1926020 пог.м.385200electric motor4333501 pcs433350rubber seal2889024 pcs693360lift lever36112,51 pcs36112,5buttons stand2407,55 pcs12037,5catch1926012 pcs231120electronic screen108337,51 pcs108337,5control lever288901 pcs28890panel stand1444501 pcs144450cotton waste96300,5 кг4815housing481501 pcs48150Energy costs114789,6Salary installation work1869287,726Costs of verification361125TOTAL7792294,826 of workers in the manufacture and installation will be:
where Тізгот - complexity of manufacturing the lift; ? chas - hourly wage rate; Nр- the number of workers involved in the manufacture of lift.
tax is calculated by the formula:
СН=7% (ЗП-ПФ)=0,07 (1700898,75 - 170089,875)=107156,62125 sum
where ПФ - pension fund, 10% of the wages;
ПФ=0,1ЗП=0,11700898,75=170089,875 sumcontributions account:
СО=4% (ЗП-ПФ)=0,04 (1700898,75 - 170089,875)=61232,355 sum
Total costs ACM wages in manufacturing lift:
ЗП=1700898,75 + +107156,62125 + 61232,355=+1869287,72625 sumcosts in the manufacture of lift:
where Руст - total installed capacity of the equipment (welding equipment, power tools, air compressor), kWt;
РЕФ - Fund effective operating time of equipment, hour;
К3 - equipment load factor for change;
КСМ - shift factor;
?- Tariff for e/energy, sum/kWt h;
? - efficiency of the service (?=0,7? 0,9).
making the lift, according to the safety requirements necessary to check the new equipment. Fees for inspection, according to the current pricelist is 361125 sum.
4.2 Payment of current expenses
Wages repair workers. Repair workers work on time-bonus pay system, but hourly rate earners. From the current practices of companies works for middle grade M and CR is - 3.5 digit. Hourly wage rate? Chas=8426,25-12037,5 sum, accept? Chas=8426,25 sum.The basic wage maintenance workers when working with the lift in the Touring Car division was:
where ТТО - volume of work bodywork section, person-hour;
? годину - hourly wage rate, sum/hour; basic wage workers to lift introduction:
wages - 10%:
СН=0,07 (68215549,5 - 6821554,95)=4297579,6185 sum
СО=0,04 (68215549,5 - 6821554,95)=2455759,782 summaintenance workers with charges:
where К1- rate premiums, К1=1,3;
connection with...