or 2010 - 2014 years and Map Kazakhstan for 2010 - 2014 years, the field program for the oil and gas sector in 2010 - 2014 years.region will build an integrated chemical complex for the production of basic petrochemical products - ethylene, polyethylene and polypropylene. Investment in the project is about 945.0 billion. In order to ensure its successful implementation, the timely allocation and development of debt and equity of the project will be implemented in phases: Phase 1 of the project will ensure the production of polypropylene capacity - 500 tons/year, the cost of Phase 1 is about 300.0 billion tenge, Phase 2 - PE 800 thousand tons/year, with the cost of 645.0 billion tenge. Project period: 2010 - 2016 years. The operator of the project - LP В«Kazakhstan Petrochemical Industries Inc.В» (Hereinafter - KPI). Supply of gas feedstock for chemical complex will be made "Tengizchevroil" for the long term (Government of the Republic of Kazakhstan as of February 15, 2008 № 142 DSP). General Contractor on a competitive basis for the construction work on one phase selected Chinese company В«Sinopec EngineeringВ». March 19, 2010 signed a contract to build a 1-phase of the "turn-key". Today started the development of construction documents.March 2010, has signed a licensing agreement for technology propane dehydrogenation and polypropylene production with the company CBI Lummus (US). Order to guarantee sales of polypropylene by a contract for guaranteed sales of finished products (off- take agreement) with the company В«Sinopec EngineeringВ». into account international experience in construction of similar facilities and to provide more attractive to substantial investment in petrochemical plants, the government decided to support the project: economic and administrative conditions for the realization of the project - the presidential decree of December 19, 2007 № 495, a special economic zone (hereinafter - SEZ) "National Industrial Petrochemical Technology Park" in Atyrau region. Since 2010, the construction of the SEZ infrastructure (administrative building and fencing FEZ); design and construction of certain infrastructure 1st phase done at the expense of budget credit in the amount of 14 billion.of major one-phase, including production facilities, is by borrowing the credit line of the Export-Import Bank of China in the amount of 207 billion tenge. March 23, 2011 in Shanghai (China), a meeting was held between the CB & I Lummus, Sinopec Engineering, and KPI, which CB & I Lummus officially handed Sinopec Engineering and KPI set of design documentation for the installation of propane dehydrogenation , March 24, 2011 held a similar meeting on transfer set Process Design for the installation of polypropylene.13, 2011 during the visit of President Hu Jintao's visit to the Republic of Kazakhstan LLP "United Chemical Company" and the Export-Import Bank of China signed a framework agreement on financial cooperation (strengthening cooperation in the transfer of technology and financial information). the infrastructure is complete. For the following infrastructure are conclusions state examination: road (complete asphalt paving), w/d path (completed laying the roadbed), power line (purchased materials, the construction), water and fuel pipeline (being purchase of materials), and the rest - to under consideration.
-phase (Polyethylene) is now Foster Wheeler (USA) finishes updating the feasibility study. Strategic partner of the South Korean company is defined В«LG CHEMВ», which in 2011 signed an agreement on establishing a joint venture with Kazakhstan LLP В«Kazakhstan Petrochemical Industries Inc.В», And a memorandum of understanding on the project financing and an agreement on the sale of products.Atyrau refinery construction of complex aromatics production capacity - the amount of benzene in 133 thousand tons/year of paraxylene - 496 thousand tons/year. The cost of the project - 169.5 billion.October 2009, the EPC contract signed between the refinery and the Chinese company В«Sinopec EngineeringВ» on "turnkey" complex. Signed an agreement of intent to purchase paraxylene with Chinese В«GUPCВ». The project will be under the general loan agreement between JSC "Development Bank of Kazakhstan" and the Export-Import Bank of China (PRC). July 30, 2010 between the BRC refinery and signed a general loan agreement to finance the project, and September 4, 2010 ceremony held "the first stone." Completion of the construction of the refinery complex planned before the end of 2013.2010, launched an investment project "Construction of a plant for the production of bitumen at Aktau Plastics Plant", which provides advanced processing of heavy oil from the Karazhanbas production of bitumen in the amount of not less than 420 thousand tons/year, corresponding to the climat ic conditions of Kazakhstan. The total project budget - 43.5 billion tenge. p align="justify"> To implement...